The start of rebuilding of North Pier (Crown Pier) 1893
The start of rebuilding of North Pier (Crown Pier) 1893

1893

North Pier of old harbour rebuilt with south return arm at right angles and now lower quay. Inside wall lengthened 220ft., outer wall 160ft. Old quay demolished and used for filling. As outer walls were designed as quays a 20ft.spur was built to shelter the north face.

Taken from the "The Growth of st Peter Port Harbour" by Eric W. Sharp

Ref: 2023-10-09-0001 Re building of North Pier

Location: North Pier (Crown Pier) St Peter Port

Buy this print online:

 
Item added to cart
The start of rebuilding of North Pier (Crown Pier) 1893

1893

North Pier of old harbour rebuilt with south return arm at right angles and now lower quay. Inside wall lengthened 220ft., outer wall 160ft. Old quay demolished and used for filling. As outer walls were designed as quays a 20ft.spur was built to shelter the north face.

Taken from the "The Growth of st Peter Port Harbour" by Eric W. Sharp

Ref: 2023-10-09-0001 Re building of North Pier

Location: North Pier (Crown Pier) St Peter Port

Buy this print online:

 
Item added to cart